Coming soon

Sprint Track vs Linear

Linear speed. Built for your whole team.

The keyboard-first developer experience you love, with time tracking, docs, and stakeholder views your PM and ops teams can actually use. Same speed bar, wider surface.

A Sprint Track issue detail view. Fast, clean, keyboard-first.
0A56-51

Copy of Build project overview analytics #48 test

Seeded issue with module, cycle, label, state, and estimate data for analytics testing.

No description provided.

Core
State
In Progress
Priority
High
Assignee
AAchala Rathnayaka
Parent Issue
None
Classification
Labels
Bug Backend
Modules
Planning
Cycle
Sprint 1 - Completed
Planning
Estimate
Select estimate
Start date
May 18, 2026
Due date
May 30, 2026
Time tracking sequence
Time tracking
Actual vs estimate: 0m 0s / 30m 0s
Total
0m 0s
Yours
0m 0s
Active
0m 0s
No time logged yet.

Why teams switch from Linear

The four gaps that turn into a second tool.

What we hear from engineering managers and CTOs running Linear for two years and counting.

01

Linear is engineering-only by design

Product, ops, and client teams end up in a second tool because Linear's UX is built for developers. The handoff cost catches up around the 20-person mark.

02

No time tracking

Linear has no native way to log hours or estimate against actuals. Agencies and any team running billable work end up in Toggl or Harvest alongside Linear.

03

Docs live somewhere else

Specs and decisions sit in Notion or Confluence. The context switch you came to Linear to escape just moved one app over.

04

Stakeholder views are missing

Gantt, Calendar, and a real spreadsheet view never shipped. Sharing a project with a client or exec means screenshotting the board.

Side-by-side comparison

Feature for feature. Speed for speed.

Thirteen rows that cover what teams compare. Linear deliberately leaves things out. Sprint Track ships them without sacrificing the developer experience.

Feature
S Sprint Track
L Linear
Issue tracking
Excellent
Sprint and cycle management
Keyboard-first UX
Full shortcut surface, command palette
Best-in-class
Time tracking
Native, billable toggle included
Multiple views (Gantt, Calendar)
All included
Board and list only
Built-in docs and wiki
Knowledge base included
Non-technical user experience
Designed for mixed teams
Primarily developer-focused
Guest and client access
Read-only shareable links
Limited, paid plan workarounds
Custom fields
Every plan
Dashboards
Custom widget builder
Limited
AI agents
Sprint Planner, Summarizer, Risk Detector built in
Linear AI on paid plans
Free tier
Unlimited workspace users
Free, capped
Starting price (paid)
Launch at $3.99 per user per month
$8 per user per month

Comparison reflects publicly published features and pricing as of June 2026. Competitor capabilities verified against their own documentation.

Where we are different

The four shifts your Linear workspace feels in week one.

The gaps Linear left on the table by design, filled without losing the speed.

One workspace for everyone

Devs on the board. PMs on the roadmap. Same workspace.

Engineering runs a keyboard-first sprint board. Product runs a Gantt roadmap. Ops runs a table. Nobody is forced into a tool that does not match their work.

1 workspace
instead of Linear plus a second PM tool

Time tracking developers actually use

A timer on every issue. No extra tab.

Click play on an issue. Mark the entry billable. Done. No third-party app, no separate browser tab, no manual reconciliation at the end of the week.

Native
instead of Linear plus Toggl plus a sync

Docs next to the issues

PRDs, decision logs, and runbooks in the same workspace.

Write the spec where the work happens. Link it to the module, the cycle, and the issues that ship it. No more two-tab life with Notion or Confluence.

0 context switch
between docs and issues

Client-shareable views

A read-only dashboard link. No client login.

Share a project status link with a client, an exec, or a board. Guests do not need an account, do not see the workspace, and cannot edit anything.

0 seat cost
for guest viewers

Move from Linear

Migrate from Linear in under fifteen minutes.

The Linear importer brings across issues, cycles, teams, labels, priorities, comments, and attachments. The keyboard-first muscle memory carries over.

01

Connect

Authenticate Sprint Track with your Linear workspace over OAuth. Linear teams map cleanly to Sprint Track projects.

02

Map

Issues, cycles, labels, priorities, statuses, and comments all auto-map. Linear shortcuts are preserved in Sprint Track's command palette.

03

Import

Run a dry-run first to verify the mapping. Then kick off the real import. Most Linear workspaces finish in under fifteen minutes.

04

Go live

Verify the imported workspace, run both tools in parallel for a sprint if you want, and cut over when the team is ready.

Zero data loss guarantee

Linear stays read-only during the import. The whole process can be rolled back per-team at any point. Bring teams across one at a time if you prefer to validate as you go.

Cost comparison

For a team of 10, the stack adds up fast.

Linear Plus alone is reasonable. Add the time tracker and the docs tool your team also pays for, and Sprint Track closes the gap by an order of magnitude.

For a team of 10 seats
You save$2,329/year
L Linear stack
$270/mo
$270
  • Linear Plus$8.00 / seat / mo
  • Toggl Track add-on$9.00 / seat / mo
  • Notion add-on$10.00 / seat / mo
S Sprint Track AI tier
$76/mo
$76
  • Issue tracking with the same keyboard-first speed
  • Native time tracking with billable toggle
  • Knowledge base for PRDs and decisions
  • Gantt, Calendar, and Table views for stakeholders
  • Shareable client dashboards, no guest seat fees

Based on published per-seat list pricing as of June 2026. Contracted volume rates vary. Sprint Track pricing reflects the AI tier with everything bundled.

What Linear switchers say

Engineering teams who kept the speed and added the surface.

We kept Linear for eighteen months but our PMs were always in a separate tool. Sprint Track gave us Linear-quality UX with enough structure for the rest of the team.
MP
Marcus Patel
CTO · Vertex Systems
Our engineers were skeptical. After a week they stopped asking when we were going back to Linear. The command palette and shortcuts hit the bar they expected.
SC
Sarah Chen
VP Engineering · Meridian Group

Frequently asked questions

The Linear migration questions every team asks.

Speed is a core design principle, not an afterthought. Keyboard shortcuts cover every common action, the command palette opens with Cmd-K, and instant search is wired across the whole workspace. The bar Linear set is the bar we hold ourselves to.

Yes. Cycle automation rules cover unstarted-issue rollover, scope-change alerts, and end-of-cycle archive. Configure once per workspace and let the cycle close itself.

Sprint Track is configurable, not mandatory complexity. The defaults are minimal. Hide what your team does not use, keep what matters, and the interface stays as quiet as Linear's while letting your PM and ops teammates do their work in the same workspace.

The most common shortcuts (Cmd-K for command palette, C to create, Cmd-Shift-P to navigate) work identically. Custom shortcuts can be remapped per user.

Insights map to Sprint Track dashboards with a custom widget builder. Saved views carry across during import and continue to filter the same way.

Try Sprint Track free. Import from Linear in 15 minutes.

Bring your teams, cycles, and issues across. Keep the speed. Add the surface your whole team needs.

No credit card required